Prefabricated Solutions

CDC has been a trusted partner of choice for challenging and complex projects involving intricate prefabricated and precast elements. Our in-house team of hydraulic and plumbing design and delivery experts take an active role in the often challenging front-loaded design resolution journey that enables prefabricated projects to be delivered successfully on time and to specification.

Case Study – 80 Collins St Melbourne

Client – QIC

Project – Integrated Mixed-Use, Commercial Office, Hotel & Retail Centre in Melbourne CBD

Budget – $10.976m CDC Contract, $445m Total Construction Value

The 80 Collins Street project includes a new 43,000m2 office tower, refurbishment of 47 levels of existing offices, a boutique NEXT hotel, and a 5,000 square metre retail precinct over a ground and podium level that links the hotel to the north and south towers and connects Collins, Exhibition, and Little Collins Street.

The delivery of the project’s design and structure was particularly challenging with approximately 7,000 tonnes of structural steel and 30,000 cubic metres of concrete used throughout the build and the new office tower constructed to cantilever 12 metres over existing buildings on Collins Street.

Case Study – 80 Collins St Melbourne

Client – QIC

Project – Integrated Mixed-Use, Commercial Office, Hotel & Retail Centre in Melbourne CBD

Budget – $10.976m CDC Contract, $445m Total Construction Value

The 80 Collins Street project includes a new 43,000m2 office tower, refurbishment of 47 levels of existing offices, a boutique NEXT hotel, and a 5,000 square metre retail precinct over a ground and podium level that links the hotel to the north and south towers and connects Collins, Exhibition, and Little Collins Street.

The delivery of the project’s design and structure was particularly challenging with approximately 7,000 tonnes of structural steel and 30,000 cubic metres of concrete used throughout the build and the new office tower constructed to cantilever 12 metres over existing buildings on Collins Street.

CDC Experience, Commercial, Office & Retail
CDC Plumbing Prefabrication Solutions - Project Case Study, 80 Collins St
CDC Plumbing Prefabrication Solutions - Project Case Study, 80 Collins St
Prefabricated Solutions
Prefabricated Solutions
Prefabricated Solutions

Case Study – The Royal Children’s Hospital

Client – PPP (Managed by Partnerships Victoria)

Project – New Hospital in Melbourne’s Parkland Precinct

Budget – $38.5m CDC Contract, $1.1b Total Project Value

The new Royal Children’s Hospital was the largest hospital redevelopment project ever undertaken in Victoria, and was delivered under a PPP model in accordance with the state’s Partnerships Victoria framework.

Construction involved the use of approximately 700 large prefabricated elements which were precast in concrete and installed on site using an enormous 350-tonne crane which had to be transported to the site from Sydney.

Due to the complexity of the design the prefabrication solution, the project’s design team spent around three months involved in pre-design work, configuring the logistics of the installation to ensure as smooth a delivery process as possible.

Case Study – The Royal Children’s Hospital

Client – PPP (Managed by Partnerships Victoria)

Project – New Hospital in Melbourne’s Parkland Precinct

Budget – $38.5m CDC Contract, $1.1b Total Project Value

The new Royal Children’s Hospital was the largest hospital redevelopment project ever undertaken in Victoria, and was delivered under a PPP model in accordance with the state’s Partnerships Victoria framework.

Construction involved the use of approximately 700 large prefabricated elements which were precast in concrete and installed on site using an enormous 350-tonne crane which had to be transported to the site from Sydney.

Due to the complexity of the design the prefabrication solution, the project’s design team spent around three months involved in pre-design work, configuring the logistics of the installation to ensure as smooth a delivery process as possible.

CDC Experience, Health & Hospitals
Prefabricated Solutions
Prefabricated Solutions
Prefabricated Solutions

Be Part of the Next Chapter

CONTACT CDC

Be Part of the Next Chapter

CONTACT CDC

Contact Us to Discuss
Your Major Project Solutions

Contact Us to Discuss
Your Major Project Solutions

Contact Us to Discuss Your Major Project Solutions