Bourke St store upgrade

The Myer redevelopment known as the most prestigious shopping facility in Melbourne was an opportunity for CDC to excel with their operational processes and their ability to meet program demand controlling risks associated with the public and ongoing demolition. 

With the redevelopment aspect of this project it was a management feat to provide continuity of work contractual obligations.

Client
Myer
Primary Contractor:
Probuild
Timeline
December, 2009
CDC Contract
$ 5,100,000
Key Requirements
  • Environmental Factors
Capabilities
  • Design & Engineering
  • Hydraulics
  • Drainage
  • Water supply
  • Gas