Unique roof span

The Melbourne Exhibition Centre facility was long overdue in providing Melbourne a much needed exhibition space. Hydraulic design was challenging due to the vast  nature of the building. This was overcome with a syphonic drainage solution.

Client
Victorian State Government
Primary Contractor:
BHPL
Timeline
February, 1996
CDC Contract
$4,000,000
Key Requirements
  • High Risk
  • Environmental Factors
Capabilities
  • Design & Engineering
  • Hydraulics
  • Drainage
  • Water supply
  • Gas